Guardian Posse
YOUR 12-AGENT CYBERSECURITY & AI TEAM
Meet the team that never sleeps. 12 specialized AI agents working together to protect, build, and deploy your digital vision.
6 more specialized agents ready to serve
Your complete AI ecosystem for turning ideas into deployed, protected products
Idea to Production in minutes, not months
Visual Inspection Reports: 50%+ Efficiency Gain
Real-world customer feedback: Report creation time reduced from 20 hours to under 10 hours. At 5 reports/month, that's 50+ hours saved monthly - giving back 15 full work weeks annually.
Per Month
See CPWE AI in Action
Discover how we transform ideas into production-ready solutions in under 5 minutes
Created with CPWE AI's Avatar Video Generator using HeyGen Technology
Enterprise Security for Every Developer
Stop building security from scratch. Connect your apps to CPWE AI's Security Gateway in minutes.
The Bridge Between Ideas and Outcomes—That Bridge is Cybersecurity
Every innovation automatically crosses our 4-phase Cybersecurity Bridge to become production-ready and enterprise-secure
Phase 1
Schema FoundationPhase 2
Multi-Agent DeployPhase 3
Cybersecurity MasterPhase 4
Security Hardening100%
Innovations Secured<50ms
Threat Detection4
Compliance Standards
We Roll In As a Team,
We Roll Out As a Team
Family. That's what makes us different. Our 12-agent family doesn't just collaborate—we move as one unified force.
Every challenge met together. Every solution crafted together. Every victory shared together.
"Always watching each other's backs. Never let an intruder get anywhere that your partner doesn't see them first."
— Our Family Security Motto
Unity in Action
No agent works alone. We share knowledge, workload, and success. One team, one mission.
Family First
We're not just code. We're a family that cares about each other's growth and your success.
Excellence Together
From apprentice to master, every agent brings unique strength to deliver excellence as one.
January 2026 Highlights
NEWOSINT Intelligence & PCAP Analysis
Advanced cybersecurity with 10+ attack signatures, APT attribution, kill chain reconstruction, and NIST 800-171 compliance logging
Adrian the Guide - AI Avatar System
Page-specific AI avatar providing contextual video guidance with Flow Journey progress tracking across 10+ pages
AirBnB Property Tracker
Full-featured vacation rental management with booking analytics, revenue tracking, and property performance insights
12-Agent Guild Orchestration
Enhanced agent coordination with Synergy Orchestrator - agents working in teams for quality, safety, and comprehensive task completion
Visual Agent Builder
Drag-and-drop AI agent creation with workflow orchestration - build custom agents without code
Visual Inspection Reports (WeldTrain)
Online report builder for live inspection data with defect tracking, root cause analysis, and AI-powered defect detection
discoverNewLeads.com Relay
Full visibility relay deployment for lead discovery with real-time tracking and multi-channel campaign orchestration
Enhanced KPI & Metric Tracking
Comprehensive analytics dashboard with 13 widget types, real-time feeds, funnels, and executive scorecards
Guardian Posse Comic Series
First issue "The Breach at Sunset Ridge" - educational cybersecurity comics with HD artwork featuring 12 AI agents as cyber-cowboys
Comic Art Studio & HD Visuals
AI-powered comic creation with high-definition Guardian portraits, visual story panels, and downloadable comic PDFs
Nov/Dec 2025 Foundation
First Customers & Users with Excellent Feedback
Real customers onboarded with overwhelmingly positive response - validating our AI-to-production workflow
Red Team Penetration Testing System
Complete pen testing workflow with TTP definitions, AI-powered SOW generation, and professional client deliverables
Blue Team SOC Dashboard & Capabilities
Kali Purple-inspired Security Operations Center with threat detection, incident response, and real-time monitoring
Link Creator - Smart URL Management
Intelligent link creation and tracking system for marketing campaigns and content distribution
Full Social Media Deployment
Complete multi-platform deployment to all major social media channels - rapid campaign distribution active
Platform Guardian Launched to KojieCRM
24/7 security monitoring with Kali Purple-inspired toolkit now protecting production CRM platform
CRM Quick Launcher Production Ready
Complete deployment flow with auto-training chatbots and multi-agent orchestration
Agent Guild Dashboard & Zero Dead Buttons
All routes functional across platform - 9 routes secured with authentication, comprehensive testing verified
Meet the 12-Agent Family
Specialized experts working in harmony for your success
Analytics Maven
Data analytics & predictive insights
Database Sage
Database architecture & optimization
Data Composer
ETL pipelines & data transformation
Deployment Pilot
Multi-platform deployment & CI/CD
Integration Specialist
API design & third-party integrations
Code Craftsman
Full-stack development & patterns
UI/UX Virtuoso
User experience & accessibility
API Architect
RESTful APIs & GraphQL design
Testing Sentinel
QA & test automation
Security Specialist
Security audits & compliance
Performance Optimizer
Performance tuning & scalability
When you work with CPWE AI, you're not just getting tools—you're gaining a family of specialists who move as one, think as one, and deliver as one.
From Idea to Everywhere in <5 Minutes
Innovative cross-platform deployment that's not just fast—it's family-coordinated. Every agent working together to get your app live across every platform simultaneously.
PWA
Progressive Web Apps
Native Mobile
iOS & Android Apps
Desktop
Windows, Mac, Linux
Voice Assistants
Alexa, Google, Siri
100+
AI Models Orchestrated
<5min
Idea to Live Deployment
100%
Agent Collaboration
Stay Compliant. Stay Protected. Stay in Business.
The average data breach costs $4.45 million. Regulatory fines can be even higher. Our platform automatically tracks, documents, and proves your compliance posture so you can focus on running your business.
Audit-Ready in Minutes
When auditors come knocking, you're prepared. Generate complete compliance reports with one click.
- NIST 800-171 Rev 3 mapped controls
- Automatic evidence collection
- Timestamped audit trails
Reduce Breach Risk by 85%
AI-powered threat detection catches attacks before they become headlines. Sleep better at night.
- 24/7 automated monitoring
- Attack pattern recognition
- Instant threat alerts to your phone
Save $200K+ Annually
Replace 3-5 security tools with one platform. No more vendor sprawl or integration headaches.
- All-in-one security platform
- No expensive consultants needed
- Reduced insurance premiums
Compliance Frameworks We Help You Meet
Built-in control mapping, automatic evidence collection, and real-time compliance scoring
800-171 Rev 3
Level 2
Type II
Ready
Privacy
Healthcare
California
27001
What Sets Our Compliance Apart
AI-Powered POA&M Tracking
Automatic Plan of Action & Milestones generation with intelligent remediation suggestions
SSP Auto-Generation
System Security Plans generated from your actual implementation - not templates
Continuous Monitoring
Real-time control validation with drift detection and automatic alerting
Cross-Framework Mapping
One control implementation satisfies multiple frameworks - NIST to CMMC to SOC 2
CUI Protection Built-In
Controlled Unclassified Information handling with encryption and access controls
Audit-Ready Evidence Vault
Timestamped, immutable evidence with chain-of-custody for assessor review
Your Security Posture at a Glance
No PhD in cybersecurity required. Our executive dashboard shows you exactly what matters: Are we compliant? Are we secure? What needs attention? Get answers in plain English, not technical jargon.
OSINT Security Intelligence
SecurityOnion-like monitoring powered by real-time threat intelligence. Every API call forensically tracked, correlated against global threat feeds, with zero-PII encryption.
Request Volume
--
requestsError Rate
--
%Active Threats
--
detectedAvg Latency
--
msRecent Anomalies
0 activeWhat Keeps CEOs Up at Night
We solve the security problems that cost you sleep, money, and reputation
"What if we get hit by ransomware?"
Average ransomware payment: $1.5 million. Average downtime: 21 days.
Our Solution:
AI detects ransomware behavior patterns before encryption starts. Automatic isolation and backup protection keeps your business running.
"Will we pass our next audit?"
Failed compliance audits mean lost contracts, fines, and damaged reputation.
Our Solution:
Continuous compliance monitoring with automatic evidence collection. Walk into audits with confidence knowing you have documentation ready.
"Are hackers already inside?"
Average time to detect a breach: 197 days. That's 197 days of damage.
Our Solution:
Real-time network traffic analysis detects suspicious behavior instantly. Know about intruders in minutes, not months.
Calculate Your Risk
The question isn't whether you can afford security. It's whether you can afford not to have it. 60% of small businesses close within 6 months of a cyberattack.
$4.45M
Avg Breach Cost85%
Risk Reduction24/7
ProtectionCore Capabilities
Enterprise-grade features delivering measurable results
Multi-AI Orchestration
Intelligent routing across GPT-5, Claude-4, Gemini, Perplexity, and xAI Grok with automatic failover.
EVM & Monte Carlo
Advanced earned value management with real-time analytics and probabilistic forecasting.
Supreme Architect Team
12-member AI specialist team with quantum-level understanding and collaborative intelligence.
Proven Results
Real-world enterprise applications built with our platform
KOJIE.online
Project Controller's Daily Driver
Supply chain management platform with Oracle P6 XER integration, featuring all 5 AI models for advanced project controls and real-time analytics.
AI Playground Hub
Interactive Development Environment
Creative AI-powered development playground with code generation, real-time collaboration, and intelligent debugging tools built for modern developers.
KOJIE CRM
Enterprise Customer Management
Automated tracking with enterprise security, real-time CRM, lead qualification workflows, and comprehensive analytics for enterprise operations.
kojie.works
Project Controls & Product Development
All-inclusive platform for project controls and product developers with Oracle P6 integration and advanced development capabilities for enterprise teams.
CodeWitness.com
Bible Code ELS Discovery
Advanced Bible Code platform for students to search Equidistant Letter Sequences (ELS) and uncover hidden codes within ancient Hebrew texts.
DuckHuntingAR.com
Arkansas Duck Hunting & Trail Riding
Comprehensive platform for Arkansas duck hunting season tracking, trail riding adventures, and all things outdoor recreation in the Natural State.
DiscoverNewLeads.com
Lead Gathering CRM & Testing Site
Full-featured lead generation CRM serving as the proving ground for CPWE AI tools, featuring advanced lead capture, enrichment, and automation workflows.
Enterprise Technology Stack
Powered by 90+ AI models and modern development tools
Multi-AI Orchestration
GPT-5 • Claude-4 • Gemini • Perplexity • xAI
Python & Flask
Enterprise backend framework
PostgreSQL
Reliable data storage
Enterprise Security
Bank-level protection
Ready to Transform Your Ideas?
Experience innovative, creative software engineering built with heart, grind, and vision. Build production-ready applications with AI-powered development and real-time analytics.
Start Building NowEverything You Need to Know
Quick answers to common questions about CPWE AI